Log in

Become Partner

Language

中文

English

繁體中文(中國香港)

繁體中文(中國台灣)

Tiếng Việt

Get in Touch

English

中文
English
繁體中文(中國香港)
繁體中文(中國台灣)
Tiếng Việt
Home / United Kingdom / London Student Accommodation / Discovery Dock West, South Quay Square, London, E14 9RT

Discovery Dock West, South Quay Square, London, E14 9RT, London

Apartment

Discovery Dock West, South Quay Square, London, E14, London E14 9RT, United Kingdom

View Distance to Universities

Property ID: S01552191
Discovery Dock West, South Quay Square,  London, E14 9RT 0
Discovery Dock West, South Quay Square,  London, E14 9RT 1
Discovery Dock West, South Quay Square,  London, E14 9RT 2
Discovery Dock West, South Quay Square,  London, E14 9RT 3
Discovery Dock West, South Quay Square,  London, E14 9RT 4
Photos (12)

Basic Info

Apartment
Knight Frank are pleased to offer this fifth floor apartment located within the Discovery Dock West development. The apartment is set over approximately 60.11 sqm (approximately 647 sqft) and offers reception room, semi open plan fully fitted kitchen, bedroom with fitted wardrobes and bathroom. The apartment is offered on a furnished basis. EPC: C We have been informed that some elements of the building are constructed using techniques or materials that do not comply with current government guidance. We have received documents advising that this building has been assessed by a competent person, who has determined that works need to be carried out to the external wall of the building. Further information on the action being taken to mitigate the risk will be provided.The EWS1 show an A3 rating. This means that further investigation needs to be carried out. We have also received the facade report confirming that formal fire safety risk assessment will need to be undertaken to determine the level of risk posed by the timber cladding/decking present on the building.The building management has confirmed that they now have the building safety fund to carry out the remediation of thepanelling/cladding at Discovery Dock West. However, works are yet to commence. Email from the landlord confirms that the EWS1/cladding will not be resolved until 2024 now. No interim measure are currently present, we await further update.

Translate

x
Total
/